![]() |
![]() |
||||||||||
|
|
THE IGHIEL SCHOOL IGHIEL IS APPROXIMATELY 5 KILOMETRES FURTHER UP THE MOUNTAIN THAN IGHIU. THERE WERE NO TOILET FACILITIES IN THE SCHOOL AND LIKE IGHIU SCHOOL THERE WAS A SHED LIKE BUILDING IN THE YARD THAT HAD HOLES IN THE GROUND FOR THE USE OF BOTH TEACHERS AND CHILDREN. THIS SCHOOL ALSO WAS WITHOUT A WATER SUPPLY. A WELL WAS DUG AND AS THERE WAS VERY LITTLE ROOM WE COULD NOT INSTALL STORAGE TANKS SO A DIFFERENT TYPE OF PUMP THAT PRESSURISED THE SYSTEM WAS INSTALLED. A SEPTIC TANK WAS DUG FOR THE SAFE DISPOSAL OF THE EFFLUENT. THERE WAS VERY LITTLE ROOM IN THE SCHOOL TO INSTALL LAVATORIES, SO WE BUILT ONE INTO A WOODSHED IN THE YARD. WALLS AND A CEILING WERE BUILT AND PLASTERED AND A CONCRETE FLOOR LAID ALL INSULATED AGAINST THE COLD. WE BUILT SEPARATE TOILET CUBICLES FOR THE GIRLS AND THE BOYS ALSO HAD A URINAL INSTALLED TO SAVE WATER, BOTH ALSO HAD WASHING FACILITIES. WATER WAS RUN TO A LABORATORY IN THE SCHOOL, THE KINDERGARTEN AND THE STAFF OFFICE. DRAINAGE WAS LAID TO TAKE AWAY RAINWATER AND FLOODWATER FROM A BASEMENT, THIS WAS IMPORTANT AS THE CHILDREN HAD NOWHERE TO PLAY IN THE WINTER APART FROM THIS BASEMENT AND IT REGULARLY FLOODED. A COMPUTER HAS BEEN DONATED TO THE SCHOOL. WORK HERE IS ONGOING. |
||||||||||
| Home | About Us | Current projects | Opportunities | Events | FAQs | Donations | Thanks to| Contact us |